Good Morning,
When i have a event with task link ("Finish-To-Start" in this case), and i'll set the task percentage the Start Date changes to one day before, but I need that the date does not change.
I will send two images to ilustrate that.
Thanks for now.
Another image, before changes the progress.
Hello Gabriel,
I was not able to replicate this behavior with a small demo and the latest version of our controls (14.2.2). Would you please provide us with a small sample project demonstrating this behavior?
Hello !
Here's the sample.
Note: When you open the sample, you will need create 3 events (A, B, C), on the start date put 27/01/2015 and 28/01/2015 in the finish date, after you link the event "A" to event "B" (Finish-to-Start), put 10% in the "Task Complete" Field of event "B" and then set the same field of the same event for 40%.
Thanks for now !
Hello Gabriel,
I was not able to reproduce this behavior with your executable file. Please review the attached video. Am I doing something wrong?
Hello !
You are editing the event by the Event Editor Form, to reproduce the error, you need to edit the record by the Tree Browser directly.
I will send a video to show you the issue.
Thank you !
Thank you for your clarification. I have reproduced the described behavior and forwarded this ticket to our developers for additional research.
Thank you for the feedback ! I will be waiting further informations !